Line C – lot 2 of Toulouse metro
Project
- Location
- Toulouse - France
- Type
- Construction of a tunnel
- Subsidiary
- NGE GC
NGE is carrying out the construction of a 8.4 km-long tunnel, 6 stations and 5 related intersection structures of the future line C of the Toulouse metro.
The project includes the use of two next-generation tunnel boring machines, of fibre-reinforced concrete segments using less steel in 95% of the projects, manufactured in a new local plant, co-owned by the consortium.
The consortium has committed to reduce its carbon footprint of the site: recycling 90% of excavated materials, using primarily renewable energy, clean vehicles or also eco-designed and low-consumption installations.
This third line of metro in Toulouse reinforced the sustainable mobility range of solutions for inhabitants of the metropolis.
The key figures
of the project
8.4
km of tunnel
km of tunnel
5
ancillary structures
ancillary structures
200 000
expected passengers each day for the line C
expected passengers each day for the line C