Ontario Line

Project
Location
Toronto - Canada
Type
Supply and installation of the railway systems
Subsidiary
Canada

NGE is part of the design and build consortium awarded in 2022 for the supply and installation of the railway systems and depot for the Ontario Line subway project.

On this project, NGE will take part in the delivery of 15.6 km of slab track, in both tunnel and viaduct environment.
The scope of work also includes the civil works and infrastructure of the depot.

The Ontario line will bring 15 new stations to the city and connect with 40 other travels options such as metro lines, regional trains and buses.

The key figures
of the project

15,6
km stand-alone rapid transit line
40
connections to other transport systems
15
stations