Project
TSO built 110 km of ballasted track between Dammam and Jubail, and linking the Riyad-Dammam line to the CTW100 line (North-South railway line).
This line will enable transport of both passengers and freight.
The key figures
of the project
110
km of ballasted track
km of ballasted track
33
sets of points and crossovers
sets of points and crossovers
114
km of main track