CTW 120 – North-South railway project

Project
Location
Saudi Arabia
Type
Track laying
Subsidiary
Saudi Arabia

TSO built 110 km of ballasted track between Dammam and Jubail, and linking the Riyad-Dammam line to the CTW100 line (North-South railway line).

This line will enable transport of both passengers and freight.

The key figures
of the project

110
km of ballasted track
33
sets of points and crossovers
114
km of main track