Cairo Metro – Line 3 Phase 3

Project
Location
Cairo - Egypt
Type
Track laying
Subsidiary
Egypt

TSO, as part of a consortium, carries out the design, procurement, laying and commissioning of the track and third (power) rail for line 3 phase 3 of the Cairo Metro.

With phase 3, line 3 is extended westwards. It will connect the city centre (Abassia station) to the west bank of the Nile (Giza) by crossing the river at Zamalek Island before splitting into two branches: one extending to the « Rod El Farag corridor » station in the north and the other to Cairo University in the south.

The project also includes the construction of the Imbaba Depot.

The key figures
of the project

18
km of double track
15
stations
9
km of tracks for the Imbaba depot