Previous Next

Repairs to the Gennevilliers Viaduct

Project
Location
Argenteuil (95) – France
Type
Structural repairs
Subsidiary
NGE FONDATIONS

When a section of walling supporting the roadway of the Gennevilliers viaduct collapsed, NGE Fondations was awarded the contract to carry out the repairs on the basis of its innovative AD/OC® (Self-Draining/Carbon Optimised) soil nail walling technique. Using this technique saves a considerable amount of time, because the prefabricated concrete slabs rest on top of each other, eliminating the need for the preliminary formwork phase.

The key figures
of the project

200 000
drivers use this road every day
100
% of the road surface is drained
6
months: fully reopened to traffic