LRT 10th of Ramadan
Project
TSO, in a joint-venture with Orascom Construction, completed the construction of the track work package on the LRT 10th of Ramadan project in Egypt.
It is the first line to connect Cairo to the New Capital, passing through the cities of El Obour, El Shoruk and Badr.
The scope of work includes 66km of ballasted double track, 10 km of single track in the depot and 11 stations.
This LRT line will connect the station of Adly Mansour (Cairo metro line 3) to the central station of the New Capital.
The key figures
of the project
66
km of ballasted track
km of ballasted track
11
stations
stations
10
km of single track for the depot
km of single track for the depot