LRT 10th of Ramadan

Project
Location
Egypt
Type
Construction of track
Subsidiary
Egypt

TSO, in a joint-venture with Orascom Construction, completed the construction of the track work package on the LRT 10th of Ramadan project in Egypt.
It is the first line to connect Cairo to the New Capital, passing through the cities of El Obour, El Shoruk and Badr.

The scope of work includes 66km of ballasted double track, 10 km of single track in the depot and 11 stations.

This LRT line will connect the station of Adly Mansour (Cairo metro line 3) to the central station of the New Capital.

The key figures
of the project

66
km of ballasted track
11
stations
10
km of single track for the depot